Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Ezaki, Tetsuro*; Jinno, Kenji*; Mitani, Yasuhiro*; *; Uchida, Masahiro; *
JNC TY8400 2000-004, 94 Pages, 2000/03
no abstracts in English
Kon, Tetsuro
JNC TN8440 2000-004, 93 Pages, 2000/03
TCMD (Tokai Construction Maintenance Division) Intranet System Integration has started in 1995. The first active activities between 1995 and 1996 has reported in a previous PNC report (PNC PN8440 97-032 TCMD Intranet System Integration Part 1). This is the second active activity's report between 1997 and 1999. Main content of this report is as follows. TCMD Intranet System Integration has completed by TCMD LAN system construction with high-speed LAN equipments and WINS services. TCMD group scheduler and conference rooms appointment system has developed by the operation of Exchange Server 5.5. The plant construction management data base system has developed - ACCESS 97/SQL Server 6.5 version. The plant construction management data base system has also developed---Internet Explorer / Active Server Pages version. The formal TCMD homepage service has begun in l998.
Suzuki, Kazuhiko*; *
JNC TJ8400 2000-052, 136 Pages, 2000/02
Though HAZOP is recognized as the useful safety assessment method, it requires a labor-intensive and time-consuming process. So recently computer-aided HAZOP has been proposed. The research report in 1999 (PNC TJ1400 99-003) presented HAZOP system based on the plant component malfunctions basic models. By using this basic model, not only state malfunction of component but also the consequence to external circumstance can be assessed. G2, which is an excellent object-oriented developer tool in GUI (Graphical User Interface), was used as a tool for developing the system. By using the graphical editor in the system, the user can carry out HAZOP easily. The purpose of this research is to improve the ability of the HAZOP system to obtain a more detailed HAZOP results. HAZOP is carried out according to the fault propagation of component level and the one of plant level based on plant component malfunctions basic models. Furthermore, the HAZOP system which can do the cause and effect analysis in detail intended for the component which processes two or more materials is developed. It is possible to carry out HAZOP for various plants by newly adding material information to the knowledgebase. We have applied this system to the Nuclear Reprocessing Facilities to demonstrate the utilities of developing system.